Ensuring Reliable Power for Aero Treatments Plant at Tumkur

Ensuring Reliable Power for Aero Treatments Plant at Tumkur

Overview:

Location: Tumkur

Scope of Work:

Apollo Power Systems was tasked with setting up the electrical infrastructure for Aero Treatments’ plant in Tumkur. The project included:

  • Securing all necessary government approvals for power sanctioning.

  • Supplying, installing, testing, and commissioning the HT yard, which included a 750 kVA transformer, 275 kVA and 305 kVA diesel generators, and control panels.

  • Setting up the complete distribution network with power and control cabling.

  • Installing light fixtures throughout the plant.

  • Establishing an effective earthing system to ensure safety and reliability.

Key Highlights:

  • Provided a comprehensive range of services, reducing the need for multiple vendors.

  • Managed all government documentation and approvals, ensuring a smooth and hassle-free process for the client.