Location: Tumkur
Apollo Power Systems was tasked with setting up the electrical infrastructure for Aero Treatments’ plant in Tumkur. The project included:
Securing all necessary government approvals for power sanctioning.
Supplying, installing, testing, and commissioning the HT yard, which included a 750 kVA transformer, 275 kVA and 305 kVA diesel generators, and control panels.
Setting up the complete distribution network with power and control cabling.
Installing light fixtures throughout the plant.
Establishing an effective earthing system to ensure safety and reliability.
Provided a comprehensive range of services, reducing the need for multiple vendors.
Managed all government documentation and approvals, ensuring a smooth and hassle-free process for the client.