Location: Bangalore
Apollo Power Systems was responsible for setting up the electrical infrastructure for Berger Paints’ plant expansion in Hindupur. The scope included:
Obtaining all necessary government approvals for power sanctioning.
Supplying, installing, testing, and commissioning the HT yard, which included a transformer, 365 kVA diesel generators, and control panels.
Setting up the complete distribution network along with power and control cabling.
Installing the light fixtures across the facility.
Establishing an effective earthing system to ensure safety and reliability.
Delivered a reliable and durable electrical infrastructure.
Completed the project on time and within the allocated budget.