Establishing LT Electrical Infrastructure at Page Industries

Establishing LT Electrical Infrastructure at Page Industries

Overview:

  • Location: Bangalore

Scope of Work:


Apollo Power Systems was entrusted with establishing the LT electrical infrastructure for Page Industries’ textile plant. The scope included:

  • Supplying, installing, testing, and commissioning the LT control panels.

  • Setting up the complete distribution network, including cable trays, power receptacles, and distribution boards.

Key Highlights:

  • Delivered a robust and reliable LT electrical infrastructure tailored to industrial needs.

  • Successfully completed the project on time and within budget, ensuring minimal disruption to operations.

Results:

  • Ensured efficient power distribution across the textile plant.

  • Enhanced the operational reliability of Page Industries’ manufacturing facility.

  • Strengthened long-term client confidence through quality execution and timely delivery.