Overview:

  • Location: Mysore

Scope of Work:


Apollo Power Systems was entrusted with establishing the electrical infrastructure for Triton Valves’ plant in Mysore. The scope included:

  • Securing all required government approvals for power sanctioning.

  • Supplying, installing, testing, and commissioning the HT yard, including a 2500 kVA transformer and HT & LT control panels.

  • Setting up the complete distribution network across the facility.

  • Implementing effective earthing systems for safety and efficiency.

Key Highlights:

  • Executed the project within the agreed timeline and budget.

  • Overcame challenges posed by the COVID-19 pandemic with efficient planning and execution.

  • Delivered a robust and reliable power infrastructure ensuring operational continuity.

Results:

  • Strengthened Triton Valves’ plant operations with a secure and efficient power system.

  • Ensured compliance, safety, and long-term reliability in line with industry standards.