Power Infrastructure Setup and 20KL Bulk Storage High-Speed Diesel Tank Installation

Power Infrastructure Setup and 20KL Bulk Storage High-Speed Diesel Tank Installation

Overview:

Location: Goa

Scope of Work:

Apollo Power Systems was responsible for establishing the power infrastructure for Manipal Hospitals in Goa. The project included:

  • Securing all necessary government approvals for power enhancement and sanctioning.

  • Supplying, installing, testing, and commissioning the HT yard, including a 1.6 MVA transformer and HT & LT control panels.

  • Installing a 20KL bulk storage high-speed diesel tank with approval from the Explosives Department in Nagpur.

  • Setting up the complete distribution network, including cable trays, power receptacles, and distribution boards.

  • Installing effective internal and external light fixtures.

  • Implementing an effective earthing system to ensure safety and reliability.

Key Highlights:

  • Enhanced the power system and infrastructure for the hospital.

  • Installed a 20KL bulk storage high-speed diesel tank to support continuous operations.

  • Managed all documentation and government approvals, ensuring the client had a smooth, hassle-free experience.