Reliable Backup Power Solution Installation at ITC Hotel Hyderabad

Reliable Backup Power Solution Installation at ITC Hotel Hyderabad

Overview

Client: ITC
Location: Hyderabad
Scope: Backup Power Solution
System Size: 3100 kVA
Equipment: MTU

Project Details

  • Supply, Installation, Testing, and Commissioning: Implemented 2x 1550 kVA DG sets with associated works.

Achievements

  • On-Schedule Completion: Successfully completed the project within the agreed timeline.

  • Compliance with ITC Standards: Adhered to ITC’s stringent norms and standards.