Reliable MTU Power Solutions for Adcock Ingram’s Pharma Plant: Ensuring Continuous Operations

Reliable MTU Power Solutions for Adcock Ingram’s Pharma Plant: Ensuring Continuous Operations

Overview

Client: Adcock Ingram
Location: Bangalore
Scope: Backup Power Solution
System Size: 1660 kVA
Equipment: MTU and Kirloskar

Project Details

  • Supply, Installation, Testing, and Commissioning: Implemented 1x 1010 kVA and 1x 650 kVA DG sets with associated works.

Achievements

  • Efficient Maintenance Access: Ensured easy access to generators for maintenance and operation despite limited space.

  • Optimal Exhaust Management: Properly positioned exhaust pipes to prevent overlap and ensure effective ventilation.

  • Unobstructed Operation: Designed the layout to allow engineers to operate both generators simultaneously without obstruction.